Date
Company
Contact
Title
Address
City
St
Zip
Country
Phone
Mobile
Fax
Email
(describe your present mixing method)
Type of Mixer & Size
How is this method performing?
Product is :
Dry
Wet
Paste
Mastic Compound
by Volume
ft3 or liters per
hour(s)
Or
by Weight
lbs. orkgs. per
Name(s)
Bulk Density (lowest/min.)
lbs./ft3g/cc
Bulk Density (tapped/max.)
Other Characteristics:
Friable
Dusty
Cohesive
Abrasive
Agglomerates
Hygroscopic
Oxidizies
Viscosity
cps @
°F /°C
Rheology :
Thixotropix
Pseudoplastic
Dilatent
Newtonian
Particle Size Distribution :
meshu microns
% less than
Mixing is performed under :
atmospheric pressure
Vacuum
"Hg
Pressure
psig
Incoming product
During Mixing
After Mixing
Are liquids added during the process?
YesNo
Liquid Viscosity
Quantity
usg /liters
Rate of Addition
gpm /lpm
Required for heating to
Required for cooling to
Medium :
water
steam
hot oil
Jacket Rating :
14.7 psig non-code
ASME / PED / ATEX code stamped for
psign/bar
The Final product is a :
free-flowing powder that can be bottom discharged.
free-flowing liquid or paste that can be bottom discharged.
non-free flowing powder that mist be dumped.
solid, mastic or compound that will be dumped.
solid, mastic or compound that will be extruded with a screw.
Clearance below discharge
Height/Ceiling restrictions
304 ,
316
316L Stainless Steel
Other Alloy
Coating
Mild Steel
304
Other
Internal :
mill,
2B,
#4,
bead blast,
grit
Ra(u inch)
External :
External Structural:
coated,
other
Electrical
voltage,
phase,
Hz
"Hg,"
cfm
Air
psig,
Water
gpm,
Steam
lbs./hour
Will mixer and controls be in different areas?
Mother Classification :
non-classified TDFC
Class :
Cls. l(gas/vapor),
Cls. ll (dust)
Division:
Div.1 (Class substance is present in normal conditions)
Div.2 (Class substance is present in abnormal conditions)
Electrical Enclosures :
NEMA-12,
NEMA-4(washdown),
NEMA-4X (washdown & corrosive),
NEMA-7&9 (XP)
NEMA-4,7&9,
Vacuum System
Heating
Liquid Addition
Linert Gas Purge
Loading/Unloading
Solvent Recovery
Cooling
Lump Breaker
Solids Sampler
Controls
Start-Up Scheduled for :
1st
2nd
3rd
4th Qtr.,
20
Is Project Funded :
Installation Location (State or Country) :